Top
Ελληνικά
A
A
A
CERA
Legislation
Electricity
Natural Gas
Consumers
International
REMIT
HOME
Electricity
Licenses List
Καταλόγοι Αδειών και Εξαιρέσεων από Άδειες
Lists of Licenses and Exemptions
This section presents the updated lists of all Licenses and Exemptions from a Construction and Operation License as well as the lists of the applications under consideration
Τέλη Παραχώρησης Μητρώου Αδειών
Show More...
Show Less
Electricity
Transmission and Distribution System
Transmission and Distribution Rules
The Transmission and Distribution Rules
Address the technical requirements and constraints that will be applied by licensees whenever they wish to be connected to the transmission system and / or to the distribution system or to use the transmission system or distribution system for the transportation of electricity;
Ensure that the technical conditions which are applied to licensees wishing to connect or use the transmission system or distribution system do not create unjustified discrimination against licensees;
Promote efficiency, reliability and economy in the use and development of the transmission system and distribution system.
The provisions of the Transmission and Distribution Rules are complied with by all license holders or exempted persons to the extent required by the permits or exemptions, respectively.
The Transmission and Distribution Rules can be found in the Legislation section, in the
Rules / Electricity category
.
Transmission System
Transmission System
is the system consisting mainly of high voltage power lines and used for the transmission of electricity from a plant to a substation or another plant or between substations.
The Cyprus Energy Regulatory Authority (CERA)
approves and revises the process and charging policy of the Transmission System as well as network usage fees. Also, CERA's responsibility is to approve, issue instructions and request a review whenever it deems necessary to the Transmission Rules.
The Cyprus Transmission System Operator (CTSO)
is the Management Unit of the Transmission System, that was established pursuant to Article 58 and is responsible for the Transmission System as provided in Articles 62 and 63 of
the Electricity Market Regulation Act
.
The Transmission System Owner (TSO)
is the EAC as the owner of the transmission system.
For more information on the Transmission System, please visit the
Cyprus Transmission System Operator (CTSO)
Distribution System
Distribution system
is the system consisting mainly of medium and low voltage power lines and used to distribute electricity from production units or other entry points up to the point of delivery to customers or other users. Also, the Distribution System includes any electrical equipment belonging to the
Distribution System Operator.
The Cyprus Energy Regulatory Authority (CERA)
approves and reviews the process and the charging policy with the Distribution System as well as the network usage fees. Also, CERA is responsible for approving, giving instructions and requesting a review, whenever it deems necessary, by the Distribution Rules.
The Distribution System Operator (DSO)
is designated by the EAC and is responsible for the operation, maintenance and development of the distribution system.
Distributor System Owner (IMS)
means the EAC as its owner of the distribution system.
For more information on the Distribution System visit the
Electricity Authority of Cyprus (EAC)
website.
New Connections
Producers with a connection power requirement of more than 8 MW or Customers (Consumers) with a connection power demand of more than 12 MVA
Under the applicable Transmission and Distribution Rules, Generators with a requested connection power greater than 8 MW or Customers (Consumers) with a requested connection power greater than 12 MVA, interested in connecting to the Transmission/Distribution System, need to submit a Connection Request to the Cyprus Transmission System Operator (CTSO).
Cyprus Energy Regulatory Authority (CERA) in its decision 821/2012 dated at 30/11/2012, approved the "Procedure for the Connection Agreement between the TSO and the Applicant (Producer / Customer)" and the "Basic Principles of Billing Policy for Connections to the System of Transmission and Distribution of RES Producers, Conventional Producers and Customers ", with effect from 01/01/2013. These texts include several elements concerning the Capital
Expenditure of the Connection, as well as other financial obligations of the Applicant.
For more information on New Connections in the Transmission System , please visit the
Cyprus Transmission System Operator (CTSO)
.
Producers with a requested connection power of up to 8 MW or Customers (Consumers) with a requested connection power of up to 12 MVA
Under the applicable Transmission and Distribution Rules, Producers with a requested connection power of up to 8 MW or Customers (Consumers) with a requested connection power of up to 12 MVA, interested in connecting to the Transmission/Distribution System, need to submit a Connection Request to the Distribution System Operator (EAC).
CERA, through the Regulatory Decision 03/2013, decided to approve the new EAC Charge Policy for Connection to the Distribution System. This regulatory decision can be found in the Legislation section.
For more information on New Connections in the Distribution System visit the
Cyprus Electricity Authority (EAC)
website
Network Tariffs
Tariffs for the use of the Transmission System, use of the Medium Voltage Distribution System, use of the Low Voltage Distribution System, the Tariff for the Recovery of the Costs of the Cyprus Transmission System Operator and the Tariff for the Provision of Ancillary Services and Long-Term Reserve
CERA, with the Regulatory Decision no. 02/2015 Statement of Regulatory Practice and Methodology of Electricity Tariffs, Κ.Δ.Π. 208/2015, issued the Calculation Methodology of the tariffs related to the use of the Transmission and Distribution Network, the recovery of the expenses of the CTSO and the provision of ancillary services and long-term reserve. By Decision No. 97/2017, CERA approved the amount of these tariffs, which are part of the final Supply Tariff, and approved their recovery through energy pricing. By Decision No. 15/2021, CERA approved the amount of these tariffs for the year 2021.
The Regulatory Decision No. 02/2015 can be found under
Legislation
.
Decision No. 97/2017 can be found in the
Decisions
section.
For the complete table of tariffs related to the Transmission and Distribution System, with effect from 1
st
January 2021, please click on the link below.
Cost of Use Table
Show More...
Show Less
Electricity Market Participants
In order to participate in the Electricity Market a prerequisite is the
possession of a permit
in accordance with articles 34 and 35 of the Electricity Market Regulations and the associated licensing Regulations. More information about licensing can be found in the
Licensing
section.
The following parties are currently participating in the Electricity Market:
Manufacturers with Thermal Units
Producers with RES Stations
Retailers
According to the
Regulatory Decision
"The Detailed Planning of Diversification of the Framework for Regulating the Operation of the
Electricity Market
of Cyprus", the following parts will contribute to the new Electricity Market regulation:
The Cyprus Transmission System Operator (CTSO)
The Market Officer
The Distribution System Operator (DSO)
Producers with:
Thermal units connected to the Transmission System or
Thermal units connected to the Distribution System with a rated installed capacity of more than 5 MW or
RES stations operating outside of National Sponsoring Plans
Aggregators for RES stations operating outside National Grant Schemes (with a maximum limit of 20MW in the total RES size they can serve)
Retailers
Wholesalers
Resolving Imbalances
Officers
In addition to the CTSO, the Market Operator and the DSO, all other parties are collectively referred to as market participants.
Trading and Settlement
The Electricity Market Rules
Govern the mechanisms, pricing and other terms and conditions that apply when license holders purchase or sell electricity in accordance with the arrangements made by the CTSO;
Ensure that license holders who are required to participate in the purchase and sale of electricity on the basis of these arrangements will not be subjected to discrimination;
Promote efficiency and economy and facilitate competition in the market and sale of electricity on the basis of these arrangements.The Electricity Market
Rules shall be complied with by all license holders or exempted persons, to the extent that is required by their permits or exclusions.
The Electricity Market Rules are in the Legislation section, in the
Rules / Electricity
category
Market
The members of the Cyprus Energy Regulatory Authority (CERA) decided to adopt a relevant study, prepared by an external consultant of CERA with the title "The new regulations in the electricity market of Cyprus" for the detailed planning of diversification of the framework for regulating the operation of the electricity market of Cyprus, and issue this regulatory decision.
The
Regulatory Decision
is referred to as "the Detailed Planning of Diversification of the Framework for Regulating the Operation of the Electricity Market of Cyprus", which has been posted on the CERA website and, among others, it has also been published in the Official Newspaper of the Republic of Cyprus as RAA 164/2015, dated at 15 May 2015.
Also, according to the above regulation, CERA has instructed the CTSO to proceed as soon as possible to the preparation of the specification for the supply of the required systems and other arrangements necessary for the orderly functioning of the electricity market as soon as possible. It has also instructed the CTSO to activate the actions required by law to develop new electricity market rules and to review, where appropriate, the transmission and distribution rules to fully implement this regulatory decision.
Producers
Producers is any natural or legal person who produces electricity in accordance with the ordinances of the Electricity Market Regulation.
At this stage there are licensed producers with Thermal Units and with RES Stations. A list of
licensed producers
can be found in the
Licensing Archive
.
The
obligations
of the producers are defined, inter alia, by the Electricity Market Regulations, the Licensing Regulations, the Electricity Market Rules, the Transmission and Distribution Rules and the conditions under their licenses are granted.
Suppliers
Suppliers
Procurement
means the sale and resale of electricity to customers and
Supplier
is the person who holds a license in accordance with Article 34 of the Electricity Market Regulation.
Currently the
licensed supplier
is the Electricity Authority of Cyprus (EAC).
The
obligations
of the suppliers are defined, inter alia, by the Regulations of Electricity Market Law, the Licensing Regulations, the Electricity Market Rules and the conditions under which they are licensed. More information can be found for the following obligations:
Pricing
Revelation of the Energy Mixture
Performance Indicators
The EAC is the
ultimate supplier
according to the Article 106 of the Electricity Market Regulation.
Pricing
According to the
Regulations of the Electricity Market Law
, all tariffs and charges for the services provided by the Law reflect the cost of providing these services, and the Cyprus Energy Regulatory Authority (CERA) sets out the principles and procedures for setting tariffs and connection chargers and for the use of the transmission and distribution system.
On 19/06/2015 the Regulatory Decision 02/2015 Regulatory Practice Statement and Methodology of Electricity Tariffs was published, KDP. 208/2015. This regulatory decision can be found in the
Legislation
section. The aim of revising the Regulatory Practice Statement and Methodology of Electricity Tariffs is to harmonize it with the best / optimal practices in Europe, and the most rational way of calculating allowable revenues and, therefore, electricity market pricing. The purpose of the Regulatory Practice Statement and Methodology of Electricity Tariffs is to regulate:
how CERA will determine the permitted revenue for each regulated activity, and
how to set the regulated pricings.
The primary objectives of the regulation of pricing are to maximize the long-term competitiveness of the Cypriot economy, to protect consumer interests in the short and long term against monopolistic prices, to serve public benefit obligations, to secure energy supplies and to promote energy efficient and quality services provided by licensees. Tariffs are determined on the basis of a methodical and consistent application of the principles contained in the methodology and the price proposals and decisions are based on substantiated data and formed after thorough stakeholder consultation.
EAC, with instructions from CERA, is in the process of revising its pricing on the basis of the revised Methodology of Electricity Tariffs, aiming at the introduction of new tariffs in March 2017.
Energy Mixture
Energy Sources Contribution to Total Fuel Mixture
The Revelation of the Energy Mixture is necessary in accordance with Article 91 (1) (d) of the
Regulation of Electricity Market Laws
. According to the Law, consumers have the right to provide information from suppliers on the contribution of each energy source to the overall fuel mix.
According to the Decision of the Cyprus Energy Regulatory Authority (CERA) 1279/2015, suppliers are obliged to make the energy mix public in their consumer accounts and other informational material they distribute to consumers. Through the disclosure of the energy mix, consumers have the ability to choose the supplier that best meets their environmental sensitivities. The period for the publication of these data shall begin from 1 July of the year X + 1 until 30 June of year X + 2.
Additionally, suppliers should publish the environmental impacts of their electricity production to consumers.
CERA, by its decision dated May 28, 2015, approved a Methodology for Computing the Cyprus Electric Energy Mixtures and Suppliers Mixture as well as a Technical Manual relevant to the process of Computing the Energy Mixture of the Electricity of Cyprus and the Suppliers, and the Disclosure of the Supplier’s Energy Mixture of Electricity.
According to the procedure, the only evidence of the origin of the electricity is the Guarantees of Origin. The disclosure process is under the supervision of CERA, to which suppliers are entitled to apply in case of disagreements with the CTSO in terms of calculating their energy mix.
For more information regarding the Disclosure of the Supplier’s Energy Mixture Methodology, visit the
Cyprus Transmission System Operator (CTSO)
website.
Performance Indicators
Article 95 of the
Regulation of the Electricity Market Laws
and
Rules (Performance Indicators)
govern the establishment and definition of performance indicators and the procedures under which Suppliers and the Distribution System Operator (DSO) comply with the performance indices.
The Suppliers and the DSO propose to the Cyprus Energy Regulatory Authority (CERA) performance indicators which will be included in the Regulations (Performance Indicators) and after they have been approved by CERA, they will be included in the Consumer Charter, which will be issued by the Suppliers and the DSO and will outline the performance indicators to inform consumers.
Performance indicators prepared by Suppliers and the DSO and which are approved by CERA are non-discriminatory but may vary for different categories of consumers.
The Regulations (Performance Indicators) may impose obligations on licensees, relevant but not limited to:
Procedures for submission or resubmission of performance indicators;
The timetable for the implementation of performance indicators;
Procedures for periodic review of performance indicators;
Some key performance indices that must be complied with by suppliers and the DSO;
Keeping and publishing a performance registry;
Administrative fines for failure to comply with performance indicators related to the preparation or implementation or revision of performance indicators;
Compensation or other treatments for consumers for failure to comply with the performance indices set out in the Performance Indicators Regulations;
Provision of information to CERA by licensees related to actual performance in relation to approved performance indices;
Notification to consumers of performance indicators and any treatments available to them;
Revision and approval or rejection of Performance Indicators submitted by Suppliers and the DSO, including the timetable; and
Providences governing compliance with performance indicators.
Renewable Energy Sources
Renewable Energy Sources
Renewable Energy Sources
means renewable non-fossil energy sources, which are wind, solar, geothermal, wave, tidal, hydroelectric, from biomass, from landfill gas, from the gases produced in sewage treatment plants and in biogas.
The aim of the Cyprus Energy Regulatory Authority (CERA) is to promote the use of renewable energy sources and to ensure the protection of the environment.
The Renewable Energy Sources systems used in Cyprus are:
Photovoltaic Systems,
Wind Systems,
Biomass, and
Solar Thermal Systems
The promotion and operation of Renewable Energy Sources is determined by the
European Directive 2009/28 / EK
regarding the
Laws for Promotion and Encouragement of the Use of Renewable Energy Sources
. These legislative frameworks can be found in the Legislation section.
National Goals
Article 4 of Directive 2009/28/EC requires a national renewable energy action plan to be adopted by each Member State. These Action Plans define Member States' national targets for the share of energy from renewable sources to be consumed in transport, power generation and heating and cooling in the year 2020, taking into account the impact of other energy efficiency policy measures on the final Energy consumption, as well as the appropriate measures to achieve these national overall targets.
Based on the National Action Plan,
the share of renewable energy sources in power generation is 16%
. In the categories of heating/cooling and transport it stands at 23.5% and 10%, respectively.
More information on Cyprus national targets and the measures to be reached can be found in the National Action Plan 2010 - 2020 on the website of the
Energy Department of the Ministry of Energy, Commerce, Industry and Tourism
.
Guarantees of Origin
According to the laws regarding the
Promotion and Encouragement of the Use of Renewable Energy Sources
and the
Promotion of Cogeneration of Electricity and Heat
, a requirement is the creation and operation of an electronic registry through which the Guarantees of Origin of Production from Renewable Energy Sources (RES) and Cogeneration Electric Energy (CHP) will be issued, transferred and canceled.
The Cyprus Energy Regulatory Authority (CERA), by its Decision No 857/2013, published in the Official Newspaper of the Republic of Cyprus on 15 March 2013, sets the Cyprus Transmission System Operator (CTSO) as the Authorized Issuer for the purpose of issuing Certificates of Guarantee of Origin for Electricity which is produced from RES for production facilities connected to both the Transmission System and the Distribution System.
Under legislation, the CTSO is also the authorized issuer for all high-efficiency cogeneration plants.
In order to ensure the objectivity, transparency and impartiality of the procedure for issuing, modifying, revoking, transferring and canceling guarantees for the origin of electricity from renewable energy sources, CERA regulates, observes, monitors, controls, oversees the functioning of the origin guarantee system and determines the necessary measures to this end.
For more information on the rules for the issuing of Guarantees of Origin and the Charging Fees, please visit the
CTSO
website and the
Electronic Registry for Guarantees of Origin
Purchase of Energy from RES
The cost paid by the EAC for energy produced from Renewable Energy Sources is published on the EAC website each month.
The cost of purchasing electricity from RES is calculated using the current EAC Fuel Cost of the month. In order to calculate the purchase price of the kilowatt-hour, the fuel price readjustment is consider (the calculation of which can be found in
Frequently Asked Questions - "Rates, Invoices - Fuel Price Adjustment"
) in the basic purchase price of RES. The basic purchase price is equal to the fuel cost of EAC, plus a variable maintenance cost for the EAC.
For the purpose of calculating the cost of purchasing electricity from RES, the fuel clause is differentiated from the clause applicable to consumers to take into account the losses of the system to which the RES producer is connected.
The basic purchase price, as well as the fuel clause, are determined using methodologies approved by the Cyprus Regulatory Authority for Energy (CERA).
For more information regarding the Energy Market Pricing Methodology from RES-Electricity, click on the link below.
Energy Market Pricing Methodology
Show More...
Show Less
Licensing
Licensing Legislation
The licensing of activities related to electricity is regulated by the Law on the Regulation of the Electricity Market, the Regulations on the Regulation of the Electricity Market (Licensing) and the Regulatory Decision 02/2021 entitled “Regulatory Framework for the Granting of the General License (Regulatory Administrative Act No 523/2021). The aforementioned Law and Regulations can be found in the Legislation section.
Pursuant to Article 26 of the Law on the Regulation of the Electricity Market, it is prohibited for any person to carry out the following activities without obtaining a license from CERA:
(a) construction of a power plant or electricity generation;
(b) supply of electricity to final customers;
(c) supply of electricity to wholesale customers;
(d) discharging any of the functions of the Transmission System Operator of Cyprus in accordance with the provisions of Article 60;
(e) carrying out any of the functions of the Distribution System Operator in accordance with the provisions of Article 47 or of the Closed Distribution System Operator in accordance with the provisions of Article 56;
(f) carrying out any of the functions of the Transmission System Owner in accordance with the provisions of Article 36;
(g) carrying out any of the functions of the Distribution System Owner in accordance with the provisions of Articles 41 and 42;
(h) performing any of the duties of the Market Operator;
(i) performing any of the duties of the Balance Responsible Party;
(j) performing any of the functions of the Aggregator or the Independent Aggregator;
(k) performing any of the duties of the Electricity Interconnector Owner;
(l) performing any of the duties of the Electricity Interconnector Operator;
(m) installing and/or operating an electricity storage facility, with the exception of electricity storage facilities operated exclusively for own use;
(n) constructing a direct line in accordance with the provisions of Article 100.
According to subsection (4) of Article 27, CERA may grant an
exemption from the obligation to hold a license
for the following activities:
(a) Generation of electricity for own use from systems with a capacity of more than 30kW up to 1MW
(b) Generation of electricity from renewable energy power plants with a capacity of more than 50kW up to 8MW.
According to subsection (1) of Article 27, CERA grants a
general license
in respect of the following activities:
(a) Generation of electricity from power plants that are not connected to the transmission or distribution system
(b) Generation of electricity from power plants with a maximum capacity of up to 20kW
(c) Generation of electricity for own use from systems with a capacity of up to 30kW
(d) Generation of electricity from renewable energy power plants with a capacity of up to 50kW
(e) Generation of electricity from small-scale high-efficiency cogeneration plants in accordance with the provisions of the Laws on the Promotion of Energy Efficiency in Heating and Cooling and Heat and Power Cogeneration; and
(f) any other activity that at the discretion of the Minister or CERA, after consultation between them, it is appropriate to establish such procedures.
According to Regulatory Decision 01/2023 entitled "Regulatory Framework for Granting a General License (Amendment)", Regulatory Administrative Act No 22/2023, the production of electricity from photovoltaic systems on the shell of an existing building with a capacity of above 50kW, was included in the categories for which a General License is granted.
License Fees
License fees are paid by the holders of licenses, exemptions and general licenses in accordance with articles 27 (2), 27 (4) (c) and 28 (2) (b) of the Law on the Regulation of the Electricity Market, the Regulations on the Regulation of the Electricity Market (Licensing) and the Regulatory Decision 02/2021 entitled “Regulatory Framework for the Granting of the General License (Regulatory Administrative Act No 523/2021). This Law, Regulation and Regulatory Decision can be found in the Legislation section.
Relevant tables with the Application Fees / annual fee / modification / transfer / exemption for each type of license and general license can be found at the following links.
Table with Licenses and Exemption Fees
Construction and Operation of a Power Plant, Electricity Supply to final customers, Distribution System Owner, Distribution System Operator, Transmission System Owner, Transmission System Operator
List of General License Fees
Table of License Fees
Electricity Supply to wholesale customers, Market Operator, Balance Responsible Party, Aggregator, Interconnection Line Owner, Interconnection Line Operator, Energy Storage Installation, Operation of Energy Storage Installation
Show More...
Show Less
Applications
General License
Notification Form
The Notification Form for obtaining a General License under the Laws on the Regulation of the Electricity Market of 2021 and 2022, and the Regulatory Decisions 02/2021 and 01/2023 “Regulatory Framework for granting a General License” (Regulatory Administrative Acts No 523/2021 and 22/2023) concerns:
(a) Generation of electricity from power plants that are not connected to the transmission or distribution system
(b) Generation of electricity from power plants with a maximum capacity of up to 20kW
(c) Generation of electricity for own use from systems with a capacity of up to 30kW
(d) Generation of electricity from renewable energy power plants with a capacity of up to 50kW
(e) Generation of electricity from small-scale high-efficiency cogeneration plants in accordance with the provisions of the Law on the Promotion of Energy Efficiency in Heating and Cooling and Heat and Power Cogeneration
(f) production of electricity from photovoltaic systems on the shell of an existing building with a capacity of above 50kW.
Submission of a Notification Form - Granting of a General License
The Notification Form is submitted to CERA electronically, as an attachment to a blank message sent to
gl@cera.org.cy
with the subject line “Notification Form for General License”. Forms which are not sufficiently completed will not be reviewed. CERA will acknowledge receipt of the Notification Form by sending a reply e-mail to the interested party.
The General License is granted and enter into force one month after the date of receipt of the Notification Form by CERA and provided that no additional information or corrective actions have been requested in writing by CERA.
For power plants generating electricity from RES for own use with a capacity of up to 50kW, no Notification Form is submitted to CERA. The General License is obtained upon connection of these plants to the distribution network.
Power plants generating electricity from RES for own use with a capacity of 10.8kW and up to 50kW for which the Distribution System Operator considers that the stability, reliability and security of the grid are not maintained in order to be connected by means of a simple connection notification, must submit to CERA a Notification Form, as submitted by the other categories of General License and accompany it with the relevant written notification of the Distribution System Operator.
At the bottom of the page you can find the General License Notification Form and the General License Terms.
Power plants that were put into operation before January 1, 2022 shall continue to operate without the obligation to obtain a General License.
Change of Details and Termination of General License
When the holder of a General License granted after submitting a notification form to CERA, makes any changes to the details that affect the General License or terminates the activity for which a General License has been granted, they must inform CERA within one (1) month by completing the relevant Details Change Form or the General License Termination Form respectively, which can be found at the bottom of the page.
General License Notification Form
General License Details Change Form
General License Termination Form
Terms of General License
Show More...
Show Less
Exemption from holding a License / RES
Application for Exemption from holding a License / RES
The application for Exemption from holding a License/RES relates to the (a) Construction and (b) Operation of RES power plants from 50kW up to 8MW, excluding the production of electricity from photovoltaic systems on the shell of an existing building with a capacity of above 50kW.
Submission of Application - Examination Procedure - Granting of an Exemption
Information on the steps to be followed under the Law on the Regulation of the Electricity Market, the Regulations on the Regulation of the Electricity Market (Licensing) regarding the Submission of Applications, the Application Examination Procedure and the Granting of an Exemption can be found in the
Frequently Asked Questions
.
Application Form - Documents and Information that must accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application when submitting it.
More information and announcements about the application and the required documents can be found in the
Licensing/Announcements - Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €170.86 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep an exemption valid and for Power Plants they amount to 68.344 €cents per kW of installed generation capacity.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Application Form for Exemption from License for Construction of RES Power Plant
Application Form for Exemption from License for Operation of RES Power Plant
Supporting Documents for Construction - Commercial
Supporting Documents for Operation - Commercial
Supporting Documents for Construction - Own Use
Supporting Documents for Operation - Own Use
CERA Bank Details
Show More...
Show Less
Exemption from holding a License / Conventional Fuels
Application for Exemption from holding a License / Conventional Fuels
The application for Exemption from holding a License/Conventional Fuels relates to (a) Construction and (b) Operation of Conventional Fuel Power Plants with an electrical capacity of more than 30kW up to 1MW, for own use.
Submission of Application - Examination Procedure - Granting of an Exemption
Information on the steps to be followed under the Law on the Regulation of the Electricity Market, the Regulations on the Regulation of the Electricity Market (Licensing) regarding the Submission of Applications, the Application Examination Procedure and the Granting of an Exemption can be found in the
Frequently Asked Questions
.
Application Form - Documents and Information that must accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application when submitting it.
More information and announcements about the application and the required documents can be found in the
Licensing/Announcements - Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €170.86 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep an exemption valid and for Power Plants they amount to 68.344 €cents per kW of installed generation capacity.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Application for Exemption from License for Construction and Operation / Conventional fuels - Own Use
Supporting Documents for Exemption from License for Construction and Operation / Conventional fuels - Own Use
CERA Bank Details
Show More...
Show Less
Construction and Operation License
Application for a license
The application for a License concerns:
Construction and operation of a power plant with conventional fuels for commercial purposes.
Construction and operation of power plants with conventional fuel in excess of 1MW for own use and back-up purposes,
Construction and operation of power plants using renewable energy sources in excess of 8MW.
Submission of Application - Examination Procedure - Granting of a License
Information on the steps to be followed under the Law on the Regulation of the Electricity Market, the Regulations on the Regulation of the Electricity Market (Licensing) regarding the Submission of Applications, the Application Examination Procedure and the Granting of a License can be found in the
Frequently Asked Questions
.
Application Form - Documents and Information that must accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application when submitting it.
More information and Announcements about the application and the required documents can be found in the
Licensing/Announcements - Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of 8.5430 €cents per kW of requested production capacity with a minimum amount of €170.86 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep a license valid and for Power Plants they amount to 68.344 €cents per kW of installed generation capacity.
More information on the annual fees can be found in the
Frequently Asked Questions
.
License application form
Documents for the application for self-consumption (construction)
Documents for the application for self-consumption (operation)
CERA Bank Details
Show More...
Show Less
Energy Storage System Installation License
Application for a License
The application for a License concerns the energy storage system installation.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of 10€cents per kW of requested output capacity of the storage system must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
No annual fee needs to be paid to keep an Energy Storage System Installation License valid.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Energy Storage System Installation License application form
Energy Storage System Installation License (standard terms)
CERA Bank Details
Show More...
Show Less
Energy Storage System Operation License
Application for a License
The application for a License concerns the energy storage system operation.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of 10€cents per kW of requested output capacity of the storage system must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep a license valid and for the Energy Storage System Operation License they amount to 70€cents per kW of requested output capacity of the storage system.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Energy Storage System Operation License Application Form
Energy Storage System Operation License (standard terms)
CERA Bank Details
Show More...
Show Less
Supply License
Application for a Supply Licence
The application for a License concerns:
electricity supply to final customers during the Transitory Regulation of the Electricity Market
electricity supply to final customers for the Competitive Electricity Market
electricity supply to wholesale customers
Application Submission – Examination Procedure – Issue of a Licence
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information section
.
Electricity Supply to final customers during the Transitory Regulation of the Electricity Market License application form
Electricity Supply to final customers during the Transitory Regulation of the Electricity Market License (standard terms)
Electricity Supply to wholesale customers License application form
Electricity Supply to wholesale customers License (standard terms)
CERA Bank Details
Show More...
Show Less
Electricity Market Operator License
Application for a License
The application for a License concerns the carrying out of the Electricity Market Operator activities.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €1.000 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep a license valid and for the Electricity Market Operator License they amount to €10.000.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Electricity Market Operator License application form
Electricity Market Operator License (standard terms)
CERA Bank Details
Show More...
Show Less
Balance Responsible Party License
Application for a License
The application for a License concerns the carrying out of the Balance Responsible Party activities.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €200 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
No annual fee needs to be paid to keep a Balance Responsible Party License valid.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Balance Responsible Party License application form
Balance Responsible Party License (standard terms)
CERA Bank Details
Show More...
Show Less
Aggregator License
Application for a License
The application for a License concerns the carrying out of the Aggregator activities.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €200 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
No annual fee needs to be paid to keep an Aggregator License valid.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Aggregator License application form
Aggregator License (standard terms)
CERA Bank Details
Show More...
Show Less
Interconnection Line Owner License
Application for a License
The application for a License concerns the carrying out of the Interconnection Line Owner activities.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €5.000 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep a license valid and for the Interconnection Line Owner License they amount to €10.000.
More information on the annual fees can be found in the
Frequently Asked Questions
.
CERA Bank Details
Interconnection Line Owner License application form
Interconnection Line Owner License (standard terms)
Show More...
Show Less
Interconnection Line Operator License
Application for a License
The application for a License concerns the carrying out of the Interconnection Line Operator activities.
Application Submission – Examination Procedure – Issue of a License
The submission and publication of the application and the examination and decision-making will be carried out in accordance with the Licensing Regulations, R.A.A. 538/2004 and the relevant decisions and regulatory decisions.
At the bottom of the page you can find the Standard Terms of the license.
Application Form – Documents and information to accompany the application
At the bottom of the page you can find the application form and all the documents/information that must accompany the application upon its submission.
More information and announcements regarding the application and the required documents can be found in the
Licensing / Announcements – Information
section.
Application Fees
In order for an application to be considered complete and registered in CERA’s Register of Applications, the application fee of €5.000 must be deposited/transferred to one of the two CERA’s bank accounts, the details of which are listed below.
The date of registration of the application in the CERA’s Register and the allocation of an application serial number is determined by the date of payment of the application fee as provided for in the Regulations on the Regulation of the Electricity Market (Licensing Fees).
The applicant is responsible for informing CERA by sending the deposit/transfer receipt to
regulator.cy@cera.org.cy
. You will be informed by CERA of the following actions and you will receive a relevant invoice and receipt from CERA’s Accounting Department to the email address stated in your application.
Annual Fees
The annual fees are the fees paid each year to keep a license valid and for the Interconnection Line Operator License they amount to €10.000.
More information on the annual fees can be found in the
Frequently Asked Questions
.
Interconnection Line Operator License application form
Interconnection Line Operator License (standard terms)
CERA Bank Details
Show More...
Show Less
Άδεια Διαχειριστή Κλειστού Συστήματος Διανομής
Αίτηση για χορήγηση Άδειας
Η αίτηση για άδεια αφορά την άσκηση δραστηριοτήτων του Διαχειριστή (φορέα εκμετάλλευσης) ενός Κλειστού Συστήματος Διανομής.
Υποβολή Αίτησης - Διαδικασία Εξέτασης - Χορήγηση Άδειας
Η διαδικασία υποβολής και δημοσίευσης της αίτησης και η εξέταση, αξιολόγηση και λήψη απόφασης από τη ΡΑΕΚ γίνεται σύμφωνα με τους περί Ρύθμισης της Αγοράς Ηλεκτρισμού (Έκδοση Αδειών) Κανονισμούς και τις σχετικές Αποφάσεις και Ρυθμιστικές Αποφάσεις.
Στο κάτω μέρος της σελίδας μπορείτε να βρείτε τους Πρότυπους Όρους της άδειας.
Έντυπο Αίτησης - Έγγραφα και Στοιχεία που πρέπει να συνοδεύουν την αίτηση
Στο κάτω μέρος της σελίδας μπορείτε να βρείτε το έντυπο αίτησης και όλα τα έγγραφα/στοιχεία που πρέπει να συνοδεύουν την αίτηση κατά την υποβολή της.
Τα έγγραφα και στοιχεία που αφορούν τα χαρακτηριστικά του Κλειστού Συστήματος Διανομής και τις τεχνικές, οικονομικές και χρηματοδοτικές δυνατότητες του αιτητή θα καθορίζονται από τη ΡΑΕΚ κατόπιν χαρακτηρισμού ενός συστήματος ως Κλειστού Συστήματος Διανομής.
Περισσότερες πληροφορίες και ανακοινώσεις σχετικά με την αίτηση και τα απαιτούμενα έγγραφα μπορείτε να βρείτε στην
Αδειοδότηση / Ανακοινώσεις - Πληροφορίες.
Τέλη Αίτησης
Για να θεωρηθεί μία αίτηση πλήρως συμπληρωμένη και να καταχωρηθεί στο μητρώο αιτήσεων της ΡΑΕΚ θα πρέπει να γίνει κατάθεση/έμβασμα του τέλους υποβολής αίτησης που ανέρχεται σε €200 σε ένα εκ των δύο τραπεζικών λογαριασμών της ΡΑΕΚ, τα στοιχεία των οποίων επισυνάπτονται.
Η ημερομηνία καταχώρησης της αίτησης σας στο μητρώο της ΡΑΕΚ και η απόκτηση αύξοντα αριθμού αίτησης καθορίζεται από την ημερομηνία πληρωμής του τέλους υποβολής αίτησης ως προνοείται στους περί Ρύθμισης της Αγοράς Ηλεκτρισμού (Τέλη Αδειών) Κανονισμούς.
Ο αιτητής έχει την ευθύνη να ενημερώσει την ΡΑΕΚ, με την αποστολή της απόδειξης κατάθεσης/εμβάσματος στην ηλεκτρονική διεύθυνση
regulator.cy@cera.org.cy
. Θα ακολουθήσει ενημέρωση από την ΡΑΕΚ για επόμενες ενέργειες και θα σας αποσταλεί σχετικό τιμολόγιο και απόδειξη από το Λογιστήριο της ΡΑΕΚ στην ηλεκτρονική διεύθυνση που δηλώθηκε στην αίτηση σας.
Ετήσια Τέλη
Τα ετήσια τέλη είναι τα τέλη που καταβάλλονται κάθε έτος για τη διατήρηση σε ισχύ μιας άδειας και για την άδεια Διαχειριστή Κλειστού Συστήματος Διανομής ανέρχεται στα €200.
Περισσότερες πληροφορίες για τα ετήσια τέλη μπορείτε να βρείτε στις
Συχνές Ερωτήσεις
.
Announcements – Information
Decision 1494/2016 – Innovative RES projects
Καθεστώς Αδειοδότησης και Διαδικασία Εξέτασης Καινοτόμων και/ή Πρωτοποριακών και/ή Πρότυπων Σταθμών Ανανεώσιμων Πηγών Ενέργειας για την Παραγωγή Ηλεκτρικής Ενέργειας
Εντολή 2/2006 - Υπουργός Εσωτερικών
Kριτήρια και διαδικασία άσκησης πολεοδομικού ελέγχου σε σχέση με αιτήσεις για τη χωροθέτηση Μονάδων
Αιολικά Πάρκα
Μετρήσεις Αιολικού Δυναμικού
Wind Farms
Decommissioning Cost
Εγκύκλιος 3/2008 - Υπουργείο Εσωτερικών
Εγκαταστάσεις Φωτοβολταϊκών Συστημάτων για τις οποίες δεν απαιτείται η υποβολή αίτησης για εξασφάλιση πολεοδομικής άδειας
Show More...
Show Less
Amendment
Amendment of Application
Amendment
of Application for License Exemption
According to the Decision of the Cyprus Energy Regulatory Authority (CERA) 280/2008, each applicant is entitled to request an amendment of his application for granting an Exemption from the Construction or Operation License of a Power Station within two (2) months from the filing date of his application. New data and documents required must be submitted by the applicant together with the request for amendment.
CERA may request from the applicant, within two (2) months from the date of the request for modification, to provide any additional information.
The fee for changing the License Exit Request is € 170.86.
Amendment of License
The Cyprus Regulatory Authority for Energy (CERA) may:
In accordance with article 12 of the
Licensing Regulation
, in response to information received or for any other reason, make a proposal amending any particular license or type of license and
In accordance with article 13, amend the permit in cases where the licensee has given his / her consent to the amendments.
CERA with
Desision 264/2019
published "Guidelines for the amendment of Licenses and Exemptions from License for Construction and Operation of power stations"
Amendment of
License Procedure
New data and documents which are required must be submitted by the licensee together with the request for amendment and the change fees, which amount to € 170.86.
Prior to any amendment of a permit in accordance with the provisions of the Regulation (Licensing), CERA issues a notice:
Indicating that a proposal to modify will be issued and defining the result of the amendment procedure.
Indicating the reasons why for the amendment proposal.
Setting the time, which must be no less than thirty (30) days from the date of publication of the notice, within which representations or objections may be made to the proposed amendment by anyone affected by it.
Takes into account any representation or objection that has taken place within the above-specified time limit and has not been withdrawn.
The notice shall be published in the Official Newspaper of the Republic and, at the discretion of CERA, shall be published in a daily released newspaper in the Republic and a copy shall be sent to each interested licensee.
Amendment of Exception from Licence
The Cyprus Energy Regulatory Authority (CERA) may:
Modify the License Exemption in agreement with the Exclusion Holder.
Responding to information received or for any other reason it deems, modify any Exemption from a license by first informing the licensee. It is provided that the fee for the amendment of the Concession Exemption shall be paid only when the responsibility for the modification falls within the scope of control of the Exempted Licensee.
CERA with
Desision 264/2019
published "Guidelines for the amendment of Licenses and Exemptions from License for Construction and Operation of power stations"
Amendment of Exclusion from License
New data and documents required must be submitted by the licensee together with the request for amendment and the change fees, which is the amount of € 170.86.
CERA may request the Licensee to provide any additional information within two (2) months of the date of submission of the Exclusion from License Amendment request.
Changes to the License Exemptions are published through the CERA website.
Guidelines
Guidelines for the amendment of licences and exemptions from a construction and operation licence for power stations
The Cyprus Energy Regulatory Authority shall issue the following guidelines with regard to the framework for the amendment of licences and exemptions from a construction and operation licence for power stations:
Increase in installed capacity
An increase in the installed capacity of the licence / Exemption from a construction licence may be allowed.
An increase in installed capacity for licence-Exemption is not allowed if the total licensed capacity of the station upon modification exceeds the maximum capacity for which a licence-Exemption may be granted.
In order to increase the installed capacity of a licence / Exemption from an operating licence, the existing licence / Exemption from a construction licence must be amended first, followed by the amendment of the licence / Exemption from an operating licence. If there is no valid licence / Exemption from a construction licence, a new licence / Exemption from a construction licence application must be submitted with a capacity equal to the requested installed capacity increase, followed by the amendment of the licence / Exemption from an operating licence.
Changes in technology
Changes regarding the power station's technology are not allowed (a power station operating on conventional fuels cannot be modified to produce power using any RES or vice versa).
Changes regarding the power plant’s type of technology are not allowed (a power station using any RES technology cannot be modified to use any other RES technology).
Changes regarding the manufacturer and the model are allowed (e.g. different type of wind turbine or photovoltaic panel or combined cycle unit).
Changes regarding the photovoltaic systems support technology are allowed according to CERA Decision No 695/2012.
Change of parcels
Expansion of a project to adjacent parcels may be allowed. Any modifications/replacement of parcels will be assessed on a case by case basis and will only be allowed if the amendment does not change the nature of the licence / Exemption from licence.
All parcels of the original licence / licence-Exemption may not be amended/replaced.
Operating regime
No change to the operating regime of a licence may be allowed (e.g. from commercial use to self-consumption and vice versa).
Notes:
Each amendment request shall be accompanied by the amendment fee as well as all necessary documents regarding the type amendment requested and the type of licence / licence exemption.
Interested holders of a licence / licence-exemption are encouraged to write to the CERA Offices stating their interest in an amendment before submitting an amendment request in order to be properly informed.
When the requested amendment concerns the increase of installed capacity of a construction and operation licence, no amendment fee will be paid, but rather the fee that should have been paid if the additional capacity had been requested via an application for a new licence / licence exemption.
All amendment requests, both those falling under the above guidelines, and those that do not, will be assessed on a case‑by‑case basis.
In any case, an amendment request cannot change the nature of the licence / licence exemption.
Extension
Each licensee is entitled to request an extension of the validity of the License he holds by submitting a request to CERA (in the form of a letter) at least three (3) months before the expiry date of the license. The request for extension is justified and is accompanied by the fee provided in the Regulations.
According to
Decision 95/2017
, dated May 24, 2017, CERA will not accept and examine any license extension requests submitted after the expiry of the License for which an extension request is made.
Transfer
License Transfer
As per Article 18 of the
Licensing Regulation
, each Licensee is entitled to request the transfer of the License he holds to another person by submitting a request to CERA (in the form of a letter)
at least three (3) months before the date of the proposed transfer
, including the proposed person for the transfer of the license and the reason for the transfer.
License Transfer Procedure
The person to whom the authorization will be transferred follows the procedures for
submitting an application
.
Licensee, who applies for a transfer of his license, pays the transfer fee amount of € 170.86.
The licensee's application for transfer of his license and the application of the person to whom the license will be transferred shall be published.
All applications together with all the necessary documents are available from CERA for inspection by any interested party for the period mentioned in the above publication.
Transfer of Exemptions from License
Each Licensee is entitled to request a transfer of the Exemptions from a license he holds to another person by submitting a request to CERA (in form of as letter)
at least three months before the date of the proposed transfer
, including the proposed person for the transfer of the license and the reason for the transfer.
Transfer Procedure Exclusion from License
The person to whom the exemption will be transferred:
Submits a request for a transfer of this exemption (Application for Exclusion of
RES
or
Conventional Fuels License
).
Submits the required data and documents (where applicable).
If it is:
Natural Person Submits → Identity Card Number
Legal person, submits → Company Articles (Registration Number, Tax Registry, Recent Registration Certificates, Shareholders and Directors).
Provides details of its technical and financial capabilities (where appropriate).
Pays the transfer fee amount of € 170.86.
Attaches an Audit Certificate (where applicable).
CERA examines the transfer request submitted and follows the procedure as if it were an exemption from a license.
Transfers of Exceptions from Licenses are published through the CERA website.
Revoke
As of Article 15 of the Regulations (Licensing), the Cyprus Energy Regulatory Authority (CERA) may revoke the license in progress,
if:
The revocation of the license has been requested in writing by the holder and CERA agrees with the revocation request;
CERA noted that the license was granted based on substantially incorrect or misleading information;
There is a change in the ownership of the license holder and CERA does not approve such change under the terms of the license;
Any fee, payable in accordance with the applicable license fees regulations, has not been paid within thirty (30) days of the date it became payable;
CERA discovers that the licensee violates any of the terms or any modified terms or any license requirements and, where CERA has issued a regulatory decision, the licensee fails to remedy the breach within a time limit;
The licensee fails to comply with any decision issued by CERA or by the Minister in relation to the licensed activities;
CERA has reasons to believe that the licensee intends to stop permanently from carrying out the licensed activities;
The licensee has been declared bankrupt.
License Revocation Process
If any of the above conditions apply, CERA may, in accordance with articles 27 and 40 of the Electricity Market Law, give notice to the licensee, stipulating that the license will be revoked unless the breach is corrected within the time Determined by CERA.
In the event that an infringement cannot be rectified or where the licensee has failed to remedy the breach for which a notice has been served, CERA shall, by decision, determine the effective date of the revocation and notify the licensee in writing.
Licenses List
Lists of Licenses and Exemptions
This section presents the updated lists of all Licenses and Exemptions from a Construction and Operation License as well as the lists of the applications under consideration
Τέλη Παραχώρησης Μητρώου Αδειών
Show More...
Show Less
Applications
Show More...
Show Less
Licenses
Show More...
Show Less
General Licenses
Show More...
Show Less
Exemptions from License
Show More...
Show Less
Revocations
Show More...
Show Less
Related Links
Έντυπο Υποβολής Ένστασης στη Βάση του Άρθρου 19(3) του Νόμου
License for Construction and Operation
Electricity Market Participants
Transmission and Distribution Rules
Related Forms
Διαδικασία Υποβολής Ένστασης στη Βάση του Άρθρου 19(3) του Νόμου
License Application Form
Electricity Supply License Application Form
Application for Exemption from License / RES
Application for Exemption from License / Conventional Fuels
Cost of Use
Energy Market Price Methodology
Cyprus Energy Regulatory Authority
Agias Paraskevis 20,
2002, Strovolos, Nicosia
Postal Address
P.O. Box: 24936
1305 Nicosia
Tel: 00357 22 666363
Fax: 00357 22 667763
Email: regulator.cy@cera.org.cy
Newsletter
Your email has been registered
FAQ
Announcements
News and Press Releases
Consultations
Regulatory Decisions
Decisions
Current Vacancies
Tenders
Privacy Policy
Contact Us
Quick Links
Sitemap
copyright@2024
Developed by Belugga
We use cookies to improve user experience, and analyze website traffic. For these reasons, we may share your site usage data with our analytics partners. By clicking
Cookie Policy
you consent to store on your device all the technologies described in our Cookie Policy.
ACCEPT